| Stir the phosphate cement, preferably on a
chilled plate. Insert and fix the bar in place, tightening the screws as quickly as
possible. The socket turnkey in the SvE Bridge Repair Kit is highly suitable. Once the cement has hardened, the screws and nuts can be ground off. Hold the nut in a screw-post turnkey so that it does not turn. 3-4 threads should be left on the nut. Fine-polish to finish off.
|
![]() Fig. 8a. Trial fitting of the screws. |